13:06 18 Nov 25
Project:
1079 Gansu Diebu Duoer 32MW Hydropower Project
- Request for post-registration changes
| Project | 1079 Gansu Diebu Duoer 32MW Hydropower Project |
|---|---|
| PRC ref | PRC-1079-001 |
| Process track | Issuance |
| DOE | CCSC |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 08 Jul 07 - 07 Jul 14 |
| Assessment opinion |
Assessment opinion (407 KB)
|
| Revised PDD |
Revised PDD (1001 KB)
Revised PDD - track changes (1018 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (168 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 05 Feb 16 -
Approved
Effective approval date: 05 Feb 16
|
| Historic statuses |
07 Jan 16 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: