Project: 3334 Biogas from Ethanol Wastewater for Electricity Generation - Request for post-registration changes
Project 3334 Biogas from Ethanol Wastewater for Electricity Generation
PRC ref PRC-3334-001
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 31 Mar 2014 - 31 Jan 2018
Assessment opinion Assessment opinion (353 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (119 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 03 Jan 19 - Approved
Effective approval date: 03 Jan 19
Historic statuses 05 Dec 18 - Request published