Project: 9230 98.7 MW wind power project at Ratlam in Madhya Pradesh by DJ Energy Private Limited - Request for post-registration changes
Project 9230 98.7 MW wind power project at Ratlam in Madhya Pradesh by DJ Energy Private Limited
PRC ref PRC-9230-001
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Decrease in the capacity

Change to the start date of the crediting period
  • Proposed start date of crediting period: 26 May 2015
Applicable crediting period 26 May 15 - 25 May 25
Assessment opinion Assessment opinion (239 KB)
Revised PDD Revised PDD (1057 KB)   Revised PDD - track changes (1211 KB)
Supplementary documents Appendix 1 - ER PRC UN 9230 TQC 0921.xlsx (21 KB)
Signed form Signed form (255 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 24 Apr 23 - Approved
Effective approval date: 23 Apr 23
Historic statuses 20 Mar 23 - Published
20 Mar 23 - Summary note being prepared
03 Apr 23 - Awaiting EB decision