02:52 13 Nov 25
Project:
9230 98.7 MW wind power project at Ratlam in Madhya Pradesh by DJ Energy Private Limited
- Request for post-registration changes
| Project | 9230 98.7 MW wind power project at Ratlam in Madhya Pradesh by DJ Energy Private Limited |
|---|---|
| PRC ref | PRC-9230-001 |
| Process track | Prior approval |
| DOE | LGAI Tech. Center S.A |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
Change to the start date of the crediting period
|
| Applicable crediting period | 26 May 15 - 25 May 25 |
| Assessment opinion |
Assessment opinion (239 KB)
|
| Revised PDD |
Revised PDD (1057 KB)
Revised PDD - track changes (1211 KB)
|
| Supplementary documents |
Appendix 1 - ER PRC UN 9230 TQC 0921.xlsx (21 KB)
|
| Signed form |
Signed form (255 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 24 Apr 23 -
Approved
Effective approval date: 23 Apr 23
|
| Historic statuses |
20 Mar 23 -
Published 20 Mar 23 - Summary note being prepared 03 Apr 23 - Awaiting EB decision |

Assessment opinion
Appendix 1 - ER PRC UN 9230 TQC 0921.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: