Project: 2687 Pakarab Fertiliser Co-generation Power Project - Request for post-registration changes
Project 2687 Pakarab Fertiliser Co-generation Power Project
PRC ref PRC-2687-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 21 Dec 09 - 20 Dec 16
Assessment opinion Assessment opinion (71 KB)
Revised PDD Revised PDD (1807 KB)   Revised PDD - track changes (2209 KB)
Supplementary documents Appendix 1 - Annex - Supplier Invoice.pdf (1013 KB)
Appendix 2 - PDD Annex.PDF (4061 KB)
Appendix 3 - PDD Annex_TC.PDF (4061 KB)
Appendix 4 - Gas Chromatograph Specifications.jpg (286 KB)
Appendix 5 - Work Instruction for Gas Chromatograph Calibration.pdf (149 KB)
Signed form Signed form (1384 KB)
DOE clarification DOE clarification 1 - Clarification response.pdf (84 KB)

VVS version VVS 2.0
Current status 20 Sep 12 - Approved
Effective approval date: 29 Aug 12
Historic statuses 19 Jun 12 - Published
26 Jul 12 - Awaiting DOE clarifications
08 Aug 12 - DOE clarifications received
08 Aug 12 - Summary note being prepared
09 Aug 12 - Awaiting EB decision