Project: 8791 Nallakonda wind farm in Andhra Pradesh - Request for post-registration changes
Project 8791 Nallakonda wind farm in Andhra Pradesh
PRC ref PRC-8791-001
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 22 Mar 13 - 21 Mar 23
Assessment opinion Assessment opinion (735 KB)
Revised PDD Revised PDD (930 KB)   Revised PDD - track changes (1035 KB)
Supplementary documents
Signed form Signed form (142 KB)
DOE clarification
VVS version VVS 2.0
Current status 19 Apr 16 - Approved
Effective approval date: 19 Apr 16
Historic statuses 21 Mar 16 - Request published