19:45 01 Feb 26
Project:
2041 Huangtuwan Hydropower Project in Gansu Province
- Request for post-registration changes
| Project | 2041 Huangtuwan Hydropower Project in Gansu Province |
|---|---|
| PRC ref | PRC-2041-001 |
| Process track | Issuance |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 19 Dec 10 - 18 Dec 17 |
| Assessment opinion |
Assessment opinion (363 KB)
|
| Revised PDD |
Revised PDD (490 KB)
Revised PDD - track changes (507 KB)
|
| Supplementary documents |
Appendix 1 - FIRR analysis for Huangtuwan on 2012.11.07.xls.zip (38 KB)
|
| Signed form |
Signed form (112 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 19 Apr 13 -
Approved
Effective approval date: 19 Apr 13
|
| Historic statuses |
21 Mar 13 -
Request published |

Assessment opinion
Appendix 1 - FIRR analysis for Huangtuwan on 2012.11.07.xls.zip
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: