Project: 2041 Huangtuwan Hydropower Project in Gansu Province - Request for post-registration changes
Project 2041 Huangtuwan Hydropower Project in Gansu Province
PRC ref PRC-2041-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 19 Dec 10 - 18 Dec 17
Assessment opinion Assessment opinion (363 KB)
Revised PDD Revised PDD (490 KB)   Revised PDD - track changes (507 KB)
Supplementary documents Appendix 1 - FIRR analysis for Huangtuwan on 2012.11.07.xls.zip (38 KB)
Signed form Signed form (112 KB)
DOE clarification
VVS version VVS 2.0
Current status 19 Apr 13 - Approved
Effective approval date: 19 Apr 13
Historic statuses 21 Mar 13 - Request published