18:18 26 Jan 25
Project:
2041 Huangtuwan Hydropower Project in Gansu Province
- Request for post-registration changes
Project | 2041 Huangtuwan Hydropower Project in Gansu Province |
---|---|
PRC ref | PRC-2041-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 19 Dec 10 - 18 Dec 17 |
Assessment opinion | Assessment opinion (363 KB) |
Revised PDD | Revised PDD (490 KB) Revised PDD - track changes (507 KB) |
Supplementary documents |
Appendix 1 - FIRR analysis for Huangtuwan on 2012.11.07.xls.zip (38 KB)
|
Signed form | Signed form (112 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 19 Apr 13 -
Approved
Effective approval date: 19 Apr 13
|
Historic statuses |
21 Mar 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: