14:59 25 Jan 25
Project:
2282 The Korea Hydro & Nuclear Power Co. Renewable Energy Project (3MW Yonggwang Photovoltaic Power + 0.75MW Kori Wind Power, Bundling Project)
- Request for post-registration changes
Project | 2282 The Korea Hydro & Nuclear Power Co. Renewable Energy Project (3MW Yonggwang Photovoltaic Power + 0.75MW Kori Wind Power, Bundling Project) |
---|---|
PRC ref | PRC-2282-001 |
Process track | Issuance |
DOE | KSA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 07 Apr 09 - 06 Apr 16 |
Assessment opinion | Assessment opinion (678 KB) |
Revised PDD | Revised PDD (4198 KB) Revised PDD - track changes (4204 KB) |
Supplementary documents | |
Signed form | Signed form (944 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 23 Dec 14 -
Approved
Effective approval date: 23 Dec 14
|
Historic statuses |
24 Nov 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: