Project: 3702 Methane Recovery and Utilisation at PT Pinago Utama Sugihwaras Palm Oil Mill, Sumatera, Indonesia. - Request for post-registration changes
Project 3702 Methane Recovery and Utilisation at PT Pinago Utama Sugihwaras Palm Oil Mill, Sumatera, Indonesia.
PRC ref PRC-3702-002
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 09 Feb 2012 - 31 Dec 2012
Assessment opinion Assessment opinion (235 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (172 KB)
DOE clarification
VVS version VVS 2.0
Current status 13 Sep 13 - Approved
Effective approval date: 13 Sep 13
Historic statuses 15 Aug 13 - Request published