02:51 22 Dec 24
Project:
0545 Durban Landfill-gas-to-electricity project – Mariannhill and La Mercy Landfills
- Request for post-registration changes
Project | 0545 Durban Landfill-gas-to-electricity project – Mariannhill and La Mercy Landfills |
---|---|
PRC ref | PRC-0545-002 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a version of methodology |
Methodology(ies) list |
ACM0001 ver. 15 -
Flaring or use of landfill gas
|
Standardized baseline(s) list | ASB0001 ver 01.0 - Standardized baseline: Grid emission factor for the Southern African power pool |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 15 Dec 13 - 14 Dec 20 |
Assessment opinion | Assessment opinion (756 KB) |
Revised PDD | Revised PDD (1878 KB) Revised PDD - track changes (3595 KB) |
Supplementary documents | |
Signed form | Signed form (104 KB) |
DOE clarification |
DOE clarification 1 - 2015-09-08 S01-F039 14152_Response to CLA on PRC.pdf (170 KB)
|
VVS version | VVS 7.0 |
Current status | 15 Oct 15 -
Approved
Effective approval date: 12 Oct 15
|
Historic statuses |
18 Aug 15 -
Published 26 Aug 15 - Awaiting DOE clarifications 09 Sep 15 - DOE clarifications received 09 Sep 15 - Summary note being prepared 22 Sep 15 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: