18:37 12 Nov 25
Project:
4294 Gwangju metropolitan city sanitary landfill LFG power plant CDM project
- Request for post-registration changes
| Project | 4294 Gwangju metropolitan city sanitary landfill LFG power plant CDM project |
|---|---|
| PRC ref | PRC-4294-001 |
| Process track | Issuance |
| DOE | DTSUS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 21 Feb 11 - 20 Feb 21 |
| Assessment opinion |
Assessment opinion (256 KB)
|
| Revised PDD |
Revised PDD (1464 KB)
Revised PDD - track changes (1505 KB)
|
| Supplementary documents |
Appendix 1 - Appendix 1. Specification of installed generator.pdf (187 KB)
Appendix 2 - Appendix 2. Specification of installed blower.pdf (142 KB)
Appendix 3 - Appendix 3. Sample of “Gwangju LFG electricity generation monthly report”.pdf (53 KB)
|
| Signed form |
Signed form (375 KB)
|
| DOE clarification | |
| VVS version | VVS 9.0 |
| Current status | 15 Jan 16 -
Approved
Effective approval date: 15 Jan 16
|
| Historic statuses |
17 Dec 15 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: