16:07 15 Jan 25
Project:
9291 Yongren Ganbala Grid-connected Photovoltaic Power Project
- Request for post-registration changes
Project | 9291 Yongren Ganbala Grid-connected Photovoltaic Power Project |
---|---|
PRC ref | PRC-9291-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 19 Feb 14 - 18 Feb 21 |
Assessment opinion | Assessment opinion (287 KB) |
Revised PDD | Revised PDD (478 KB) Revised PDD - track changes (1313 KB) |
Supplementary documents | |
Signed form | Signed form (1417 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 02 Dec 16 -
Approved
Effective approval date: 02 Dec 16
|
Historic statuses |
03 Nov 16 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: