Project:
2693 Gansu Luqu Duosongduo Hydropower Station Project
- Request for post-registration changes
| Project | 2693 Gansu Luqu Duosongduo Hydropower Station Project |
|---|---|
| PRC ref | PRC-2693-001 |
| Process track | Issuance |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 28 Feb 11 - 27 Feb 18 |
| Assessment opinion |
Assessment opinion (703 KB)
|
| Revised PDD |
Revised PDD (1202 KB)
Revised PDD - track changes (975 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (878 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 09 Apr 13 -
Approved
Effective approval date: 09 Apr 13
|
| Historic statuses |
11 Mar 13 -
Request published |

Assessment opinion