Project: 1510 Yunnan Mopo River 12.5 MW Hydropower Project - Request for post-registration changes
Project 1510 Yunnan Mopo River 12.5 MW Hydropower Project
PRC ref PRC-1510-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 29 Apr 08 - 28 Apr 15
Assessment opinion Assessment opinion (270 KB)
Revised PDD Revised PDD (970 KB)   Revised PDD - track changes (973 KB)
Supplementary documents
Signed form Signed form (110 KB)
DOE clarification
VVS version VVS 2.0
Current status 11 Mar 13 - Approved
Effective approval date: 11 Mar 13
Historic statuses 08 Feb 13 - Request published