02:33 14 Nov 25
Project:
1510 Yunnan Mopo River 12.5 MW Hydropower Project
- Request for post-registration changes
| Project | 1510 Yunnan Mopo River 12.5 MW Hydropower Project |
|---|---|
| PRC ref | PRC-1510-001 |
| Process track | Issuance |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 29 Apr 08 - 28 Apr 15 |
| Assessment opinion |
Assessment opinion (270 KB)
|
| Revised PDD |
Revised PDD (970 KB)
Revised PDD - track changes (973 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (110 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 11 Mar 13 -
Approved
Effective approval date: 11 Mar 13
|
| Historic statuses |
08 Feb 13 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: