00:50 25 Oct 25
Project:
8060 Improved Cookstoves Program for Zambia
- Request for post-registration changes
| Project | 8060 Improved Cookstoves Program for Zambia |
|---|---|
| PRC ref | PRC-8060-001 |
| Process track | Prior approval |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 07 Nov 12 - 06 Nov 19 |
| Assessment opinion |
Assessment opinion (247 KB)
|
| Revised PDD |
Revised PDD (1107 KB)
Revised PDD - track changes (1182 KB)
|
| Supplementary documents |
Appendix 1 - ER Spreadsheet_CPA-DDs.zip (289 KB)
Appendix 2 - Revised CPA-DDs_Clean.zip (3378 KB)
Appendix 3 - Revised CPA-DDs_trackchange.zip (3889 KB)
|
| Signed form |
Signed form (4526 KB)
|
| DOE clarification |
DOE clarification 1 - Zambia_POA_DD_clean.pdf (1007 KB)
DOE clarification 2 - Zambia_POA_DD_TC.pdf (1070 KB)
DOE clarification 3 - Response to UNFCCC Clarification(3).pdf (263 KB)
DOE clarification 4 - Final Validation report.pdf (573 KB)
DOE clarification 5 - Zambia_CPAs_Clean.zip (3311 KB) DOE clarification 6 - Zambia_CPAs_TC.zip (4071 KB) |
| VVS version | VVS 9.0 |
| Current status | 02 May 16 -
Approved
Effective approval date: 28 Apr 16
|
| Historic statuses |
19 Jan 16 -
Published 17 Mar 16 - Awaiting DOE clarifications 29 Mar 16 - DOE clarifications received 29 Mar 16 - Summary note being prepared 08 Apr 16 - Awaiting EB decision |

Assessment opinion
Appendix 1 - ER Spreadsheet_CPA-DDs.zip
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: