Project: 9197 Biogas recovery from wastewater treatment in PT. Umbul Mas Wisesa Palm Oil Mill - Request for post-registration changes
Project 9197 Biogas recovery from wastewater treatment in PT. Umbul Mas Wisesa Palm Oil Mill
PRC ref PRC-9197-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 16 Apr 2015 - 30 Apr 2016
Assessment opinion Assessment opinion (410 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (166 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 18 Jun 19 - Approved
Effective approval date: 18 Jun 19
Historic statuses 20 May 19 - Request published