12:03 23 Jan 25
Project:
4678 Methane Emission Utilization for Power Generation from Ethanol wastewater treatment at PT. Indonesia Ethanol, Lampung province, Indonesia
- Request for post-registration changes
Project | 4678 Methane Emission Utilization for Power Generation from Ethanol wastewater treatment at PT. Indonesia Ethanol, Lampung province, Indonesia |
---|---|
PRC ref | PRC-4678-001 |
Process track | Prior approval |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (709 KB) |
Revised PDD | |
Supplementary documents | |
Signed form | Signed form (110 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 22 Apr 15 -
Approved
Effective approval date: 18 Apr 15
|
Historic statuses |
17 Mar 15 -
Published 17 Mar 15 - Summary note being prepared 28 Mar 15 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: