Project: 4678 Methane Emission Utilization for Power Generation from Ethanol wastewater treatment at PT. Indonesia Ethanol, Lampung province, Indonesia - Request for post-registration changes
Project 4678 Methane Emission Utilization for Power Generation from Ethanol wastewater treatment at PT. Indonesia Ethanol, Lampung province, Indonesia
PRC ref PRC-4678-001
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Feb 2012 - 30 Sep 2014
Assessment opinion Assessment opinion (709 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (110 KB)
DOE clarification
VVS version VVS 7.0
Current status 22 Apr 15 - Approved
Effective approval date: 18 Apr 15
Historic statuses 17 Mar 15 - Published
17 Mar 15 - Summary note being prepared
28 Mar 15 - Awaiting EB decision