Project: 4827 Haouma Wind Farm Project, developed by NAREVA HOLDING - Request for post-registration changes
Project 4827 Haouma Wind Farm Project, developed by NAREVA HOLDING
PRC ref PRC-4827-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 31 Dec 12 - 30 Dec 19
Assessment opinion Assessment opinion (468 KB)
Revised PDD Revised PDD (2281 KB)   Revised PDD - track changes (2418 KB)
Supplementary documents
Signed form Signed form (37 KB)
DOE clarification
VVS version VVS 2.0
Current status 31 Oct 18 - Approved
Effective approval date: 31 Oct 18
Historic statuses 02 Oct 18 - Request published