Project: 8671 15 MW Solar Photovoltaic Power Project at Gujarat - Request for post-registration changes
Project 8671 15 MW Solar Photovoltaic Power Project at Gujarat
PRC ref PRC-8671-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 27 Dec 12 - 26 Dec 19
Assessment opinion Assessment opinion (337 KB)
Revised PDD Revised PDD (539 KB)   Revised PDD - track changes (542 KB)
Supplementary documents
Signed form Signed form (129 KB)
DOE clarification
VVS version VVS 9.0
Current status 05 Oct 17 - Approved
Effective approval date: 05 Oct 17
Historic statuses 06 Sep 17 - Request published