07:32 28 Dec 24
Project:
2910 K-water 0.96MW bundle small-scale hydroelectric power plants project
- Request for post-registration changes
Project | 2910 K-water 0.96MW bundle small-scale hydroelectric power plants project |
---|---|
PRC ref | PRC-2910-001 |
Process track | Issuance |
DOE | KFQ |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jun 10 - 31 May 20 |
Assessment opinion | Assessment opinion (697 KB) |
Revised PDD | Revised PDD (2038 KB) Revised PDD - track changes (2046 KB) |
Supplementary documents | |
Signed form | Signed form (677 KB) |
DOE clarification | |
VVS version | VVS-PA 1.0 |
Current status | 03 Nov 17 -
Approved
Effective approval date: 03 Nov 17
|
Historic statuses |
05 Oct 17 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: