Project:
8163 Sapphire 49.5 MW Wind Farm Project
- Request for post-registration changes
Project | 8163 Sapphire 49.5 MW Wind Farm Project |
---|---|
PRC ref | PRC-8163-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 22 Nov 15 - 21 Nov 25 |
Assessment opinion | Assessment opinion (539 KB) |
Revised PDD | Revised PDD (4610 KB) Revised PDD - track changes (4790 KB) |
Supplementary documents |
Appendix 1 - Sapphire-ER sheet_withPRC.xlsx (74 KB)
|
Signed form | Signed form (135 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 10 Apr 17 -
Approved
Effective approval date: 09 Apr 17
|
Historic statuses |
13 Feb 17 -
Published 27 Feb 17 - Awaiting DOE clarifications 06 Mar 17 - DOE clarifications received 06 Mar 17 - Summary note being prepared 20 Mar 17 - Awaiting EB decision |