12:18 27 Dec 24
Project:
9761 Fes New Landfill Gas Recovery Reuse and Flaring Project
- Request for post-registration changes
Project | 9761 Fes New Landfill Gas Recovery Reuse and Flaring Project |
---|---|
PRC ref | PRC-9761-001 |
Process track | Issuance |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 12 Mar 15 - 11 Mar 25 |
Assessment opinion | Assessment opinion (344 KB) |
Revised PDD | Revised PDD (1295 KB) Revised PDD - track changes (1480 KB) |
Supplementary documents |
Appendix 1 - 9761 PRC ER Sheet 2212R.xlsx (149 KB)
Appendix 2 - 9761 IRR Sheet_PRC.xls (82 KB) |
Signed form | Signed form (129 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 28 Apr 21 -
Approved
Effective approval date: 28 Apr 21
|
Historic statuses |
30 Mar 21 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: