Project: 9761 Fes New Landfill Gas Recovery Reuse and Flaring Project - Request for post-registration changes
Project 9761 Fes New Landfill Gas Recovery Reuse and Flaring Project
PRC ref PRC-9761-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 12 Mar 2015 - 30 Apr 2018

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 12 Mar 15 - 11 Mar 25
Assessment opinion Assessment opinion (344 KB)
Revised PDD Revised PDD (1295 KB)   Revised PDD - track changes (1480 KB)
Supplementary documents Appendix 1 - 9761 PRC ER Sheet 2212R.xlsx (149 KB)
Appendix 2 - 9761 IRR Sheet_PRC.xls (82 KB)
Signed form Signed form (129 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 28 Apr 21 - Approved
Effective approval date: 28 Apr 21
Historic statuses 30 Mar 21 - Request published