23:59 10 Jan 25
Project:
1260 9 MW Renewable Energy Grid Connected Biomass Power Project
- Request for post-registration changes
Project | 1260 9 MW Renewable Energy Grid Connected Biomass Power Project |
---|---|
PRC ref | PRC-1260-001 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 14 Sep 07 - 13 Sep 14 |
Assessment opinion | Assessment opinion (696 KB) |
Revised PDD | Revised PDD (759 KB) Revised PDD - track changes (661 KB) |
Supplementary documents | |
Signed form | Signed form (51 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 16 Apr 13 -
Approved
Effective approval date: 16 Apr 13
|
Historic statuses |
18 Mar 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: