Project: 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa - Request for post-registration changes
Project 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa
PRC ref PRC-4728-001
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 01 Jul 11 - 30 Jun 18
Assessment opinion Assessment opinion (1794 KB)
Revised PDD Revised PDD (7273 KB)   Revised PDD - track changes (7625 KB)
Supplementary documents Appendix 1 - 2017-03-16 Beatrix CDM Financial Model_submitted.xls (726 KB)
Appendix 2 - 2017-06-19 Beatrix methane revised ex ante CER calcs_submitted.xlsx (381 KB)
Appendix 3 - 01. 2016-06-20 Beatrix LoA_signed_RSA DNA.pdf (714 KB)
Appendix 4 - 02. LoA Switzerland and Approval Letter.pdf (706 KB)
Signed form Signed form (2182 KB)
DOE clarification
VVS version VVS 9.0
Current status 02 Oct 17 - Approved
Effective approval date: 01 Oct 17
Historic statuses 21 Aug 17 - Published
21 Aug 17 - Summary note being prepared
11 Sep 17 - Awaiting EB decision