Project: 7357 EL PORVENIR I Wind Farm - Request for post-registration changes
Project 7357 EL PORVENIR I Wind Farm
PRC ref PRC-7357-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 22 Feb 2014 - 31 Dec 2018

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Changes to the technologies/measures
Applicable crediting period 22 Feb 14 - 21 Feb 21
Assessment opinion Assessment opinion (182 KB)
Revised PDD Revised PDD (2547 KB)   Revised PDD - track changes (2194 KB)
Supplementary documents
Signed form Signed form (117 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 04 Apr 23 - Approved
Effective approval date: 04 Apr 23
Historic statuses 06 Mar 23 - Request published