Project: 9904 Tanzania Renewable Energy Programme - Request for post-registration changes
Project 9904 Tanzania Renewable Energy Programme
PRC ref PRC-9904-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Addition of specific case CPA DDs corresponding to generic CPA DDs
Applicable crediting period 08 May 14 - 07 May 21
Assessment opinion Assessment opinion (553 KB)
Revised PDD Revised PDD (1851 KB)   Revised PDD - track changes (1853 KB)
Supplementary documents Appendix 1 - Darakuta SHP CPA DD_24Jun2016_Clean_ver 5.pdf (980 KB)
Appendix 2 - Darakuta Validation report VVS 09 V05 FINAL.pdf (936 KB)
Appendix 3 - ER Calculation Darakuta Small Hydro_15Feb2016 (latest rev).xlsx (63 KB)
Signed form Signed form (170 KB)
DOE clarification DOE clarification 1 - Clarification document Darakuta CPA.pdf (208 KB)
VVS version VVS 9.0
Current status 25 Nov 16 - Rejected
Effective rejection date: 17 Nov 16. Reason (80 KB)
Historic statuses 07 Jun 16 - Published
20 Jun 16 - Awaiting DOE clarifications
04 Jul 16 - DOE clarifications received
24 Oct 16 - Summary note being prepared
27 Oct 16 - Awaiting EB decision