15:43 18 Nov 24
Project:
9904 Tanzania Renewable Energy Programme
- Request for post-registration changes
Project | 9904 Tanzania Renewable Energy Programme |
---|---|
PRC ref | PRC-9904-001 |
Process track | Prior approval |
DOE | AENOR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Addition of specific case CPA DDs corresponding to generic CPA DDs |
Applicable crediting period | 08 May 14 - 07 May 21 |
Assessment opinion | Assessment opinion (553 KB) |
Revised PDD | Revised PDD (1851 KB) Revised PDD - track changes (1853 KB) |
Supplementary documents |
Appendix 1 - Darakuta SHP CPA DD_24Jun2016_Clean_ver 5.pdf (980 KB)
Appendix 2 - Darakuta Validation report VVS 09 V05 FINAL.pdf (936 KB) Appendix 3 - ER Calculation Darakuta Small Hydro_15Feb2016 (latest rev).xlsx (63 KB) |
Signed form | Signed form (170 KB) |
DOE clarification |
DOE clarification 1 - Clarification document Darakuta CPA.pdf (208 KB)
|
VVS version | VVS 9.0 |
Current status | 25 Nov 16 -
Rejected
Effective rejection date: 17 Nov 16.
Reason (80 KB)
|
Historic statuses |
07 Jun 16 -
Published 20 Jun 16 - Awaiting DOE clarifications 04 Jul 16 - DOE clarifications received 24 Oct 16 - Summary note being prepared 27 Oct 16 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: