Project: 10236 Sogamoso Hydroelectric Project - Request for post-registration changes
Project 10236 Sogamoso Hydroelectric Project
PRC ref PRC-10236-002
Process track Issuance
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 15 Jun 16 - 14 Jun 23
Assessment opinion Assessment opinion (258 KB)
Revised PDD Revised PDD (1782 KB)   Revised PDD - track changes (1813 KB)
Supplementary documents
Signed form Signed form (358 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 20 Dec 19 - Approved
Effective approval date: 20 Dec 19
Historic statuses 21 Nov 19 - Request published