Project: 1512 1.5 MW Deogad hydroelectric project in Maharashtra, district Sindhudurg, India by M/s Gadre Marine Export - Request for post-registration changes
Project 1512 1.5 MW Deogad hydroelectric project in Maharashtra, district Sindhudurg, India by M/s Gadre Marine Export
PRC ref PRC-1512-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 25 Jun 10 - 24 Jun 20
Assessment opinion Assessment opinion (952 KB)
Revised PDD Revised PDD (506 KB)   Revised PDD - track changes (509 KB)
Supplementary documents Appendix 1 - PDD version 4 registered.pdf (502 KB)
Signed form Signed form (46 KB)
DOE clarification
Current status 08 May 15 - Approved
Effective approval date: 08 May 15
Historic statuses 09 Apr 15 - Request published