Project:
3684 Inner Mongolia Jingneng Chayouzhong Wind Farm Phase II Project
- Request for post-registration changes
Project | 3684 Inner Mongolia Jingneng Chayouzhong Wind Farm Phase II Project |
---|---|
PRC ref | PRC-3684-001 |
Process track | Prior approval |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 03 Nov 10 - 02 Nov 17 |
Assessment opinion | Assessment opinion (477 KB) |
Revised PDD | Revised PDD (1284 KB) Revised PDD - track changes (1396 KB) |
Supplementary documents |
Appendix 1 - IRR analysis sheet_Chayouzhong PRC8311 Ref 3684-1.xls (96 KB)
Appendix 2 - ER Calculation_Chayouzhong PRC8311 Ref 3684-1.xls (90 KB) |
Signed form | Signed form (41 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 06 Mar 13 -
Approved
Effective approval date: 05 Mar 13
|
Historic statuses |