Project: 3684 Inner Mongolia Jingneng Chayouzhong Wind Farm Phase II Project - Request for post-registration changes
Project 3684 Inner Mongolia Jingneng Chayouzhong Wind Farm Phase II Project
PRC ref PRC-3684-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 03 Nov 10 - 02 Nov 17
Assessment opinion Assessment opinion (477 KB)
Revised PDD Revised PDD (1284 KB)   Revised PDD - track changes (1396 KB)
Supplementary documents Appendix 1 - IRR analysis sheet_Chayouzhong PRC8311 Ref 3684-1.xls (96 KB)
Appendix 2 - ER Calculation_Chayouzhong PRC8311 Ref 3684-1.xls (90 KB)
Signed form Signed form (41 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 Mar 13 - Approved
Effective approval date: 05 Mar 13
Historic statuses 29 Jan 13 - Published
29 Jan 13 - Summary note being prepared