Project:
3684 Inner Mongolia Jingneng Chayouzhong Wind Farm Phase II Project
- Request for post-registration changes
| Project | 3684 Inner Mongolia Jingneng Chayouzhong Wind Farm Phase II Project |
|---|---|
| PRC ref | PRC-3684-001 |
| Process track | Prior approval |
| DOE | BVI |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 03 Nov 10 - 02 Nov 17 |
| Assessment opinion |
Assessment opinion (477 KB)
|
| Revised PDD |
Revised PDD (1284 KB)
Revised PDD - track changes (1396 KB)
|
| Supplementary documents |
Appendix 1 - IRR analysis sheet_Chayouzhong PRC8311 Ref 3684-1.xls (96 KB)
Appendix 2 - ER Calculation_Chayouzhong PRC8311 Ref 3684-1.xls (90 KB)
|
| Signed form |
Signed form (41 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 06 Mar 13 -
Approved
Effective approval date: 05 Mar 13
|
| Historic statuses |
29 Jan 13 -
Published 29 Jan 13 - Summary note being prepared 12 Feb 13 - Awaiting EB decision |