Project: 1314 Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) - Request for post-registration changes
Project 1314 Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA)
PRC ref PRC-1314-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 09 Jun 2012 - 09 Jun 2012
Assessment opinion Assessment opinion (415 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (49 KB)
DOE clarification
VVS version VVS 2.0
Current status 26 Mar 13 - Approved
Effective approval date: 26 Mar 13
Historic statuses 25 Feb 13 - Request published