Project: 5028 CANELA II WIND FARM PROJECT - Request for post-registration changes
Project 5028 CANELA II WIND FARM PROJECT
PRC ref PRC-5028-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 13 Aug 12 - 12 Aug 19
Assessment opinion Assessment opinion (355 KB)
Revised PDD Revised PDD (1483 KB)   Revised PDD - track changes (1517 KB)
Supplementary documents Appendix 1 - 5028 PRC FVR_Canela 06 08 2025_TC.pdf (367 KB)
Signed form Signed form (229 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 30 Sep 25 - Approved
Effective approval date: 30 Sep 25
Historic statuses 01 Sep 25 - Request published