08:50 09 Jan 25
Project:
4236 Ban Coc Hydropower Project
- Request for post-registration changes
Project | 4236 Ban Coc Hydropower Project |
---|---|
PRC ref | PRC-4236-001 |
Process track | Issuance |
DOE | DTSUS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 01 Mar 11 - 28 Feb 18 |
Assessment opinion | Assessment opinion (183 KB) |
Revised PDD | Revised PDD (1344 KB) Revised PDD - track changes (1447 KB) |
Supplementary documents |
Appendix 1 - Annex 1_FSR_Transformer information.pdf (608 KB)
Appendix 2 - Annex 2_Specification of the transformer.pdf (401 KB) |
Signed form | Signed form (383 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 24 Apr 13 -
Approved
Effective approval date: 24 Apr 13
|
Historic statuses |
26 Mar 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: