Project: 4776 Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. - Request for post-registration changes
Project 4776 Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited.
PRC ref PRC-4776-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 15 Mar 13 - 14 Mar 23
Assessment opinion Assessment opinion (133 KB)
Revised PDD Revised PDD (964 KB)   Revised PDD - track changes (997 KB)
Supplementary documents Appendix 1 - estimated ER.xls (32 KB)
Signed form Signed form (51 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 14 Jan 21 - Approved
Effective approval date: 14 Jan 21
Historic statuses 16 Dec 20 - Request published