Project: 10285 Ethiopia Off-Grid Renewable Energy Program - Request for post-registration changes
Project 10285 Ethiopia Off-Grid Renewable Energy Program
PRC ref PRC-10285-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD

Changes to the project or programme design
  • Changes have an impact on: Addition or change of technologies/measures with or without addition or change of applied methodologies
Applicable crediting period 01 Jul 16 - 30 Jun 23
Assessment opinion Assessment opinion (554 KB)
Revised PDD Revised PDD (1405 KB)   Revised PDD - track changes (1428 KB)
Supplementary documents Appendix 1 - 2018-06-20 PoA PRC Assessment Report_v2.0_tc.pdf (560 KB)
Appendix 2 - 2018-06-20 S01-F039_v1.0.pdf (124 KB)
Signed form Signed form (51 KB)
DOE clarification DOE clarification 1 - PoA10285_2018-07-30 PoA PRC Assessment Report_v3.0_c.pdf (555 KB)
DOE clarification 2 - PoA10285_2018-07-30 S01-F039_v1.0_CL.pdf (191 KB)
VVS version VVS-PoA 1.0
Current status 02 Oct 18 - Approved
Effective approval date: 01 Oct 18
Historic statuses 20 Jul 18 - Published
26 Jul 18 - Awaiting DOE clarifications
27 Aug 18 - DOE clarifications received
27 Aug 18 - Summary note being prepared
11 Sep 18 - Awaiting EB decision