16:40 13 Nov 25
Project:
10285 Ethiopia Off-Grid Renewable Energy Program
- Request for post-registration changes
| Project | 10285 Ethiopia Off-Grid Renewable Energy Program |
|---|---|
| PRC ref | PRC-10285-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD Changes to the project or programme design
|
| Applicable crediting period | 01 Jul 16 - 30 Jun 23 |
| Assessment opinion |
Assessment opinion (554 KB)
|
| Revised PDD |
Revised PDD (1405 KB)
Revised PDD - track changes (1428 KB)
|
| Supplementary documents |
Appendix 1 - 2018-06-20 PoA PRC Assessment Report_v2.0_tc.pdf (560 KB)
Appendix 2 - 2018-06-20 S01-F039_v1.0.pdf (124 KB)
|
| Signed form |
Signed form (51 KB)
|
| DOE clarification |
DOE clarification 1 - PoA10285_2018-07-30 PoA PRC Assessment Report_v3.0_c.pdf (555 KB)
DOE clarification 2 - PoA10285_2018-07-30 S01-F039_v1.0_CL.pdf (191 KB)
|
| VVS version | VVS-PoA 1.0 |
| Current status | 02 Oct 18 -
Approved
Effective approval date: 01 Oct 18
|
| Historic statuses |
20 Jul 18 -
Published 26 Jul 18 - Awaiting DOE clarifications 27 Aug 18 - DOE clarifications received 27 Aug 18 - Summary note being prepared 11 Sep 18 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: