Project: 2225 Korea Midland Power Co., LTD. (KOMIPO) Boryeong Small Hydroelectric Power Plant Project - Request for post-registration changes
Project 2225 Korea Midland Power Co., LTD. (KOMIPO) Boryeong Small Hydroelectric Power Plant Project
PRC ref PRC-2225-001
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Aug 09 - 31 Jul 19
Assessment opinion Assessment opinion (346 KB)
Revised PDD Revised PDD (1169 KB)   Revised PDD - track changes (1199 KB)
Supplementary documents Appendix 1 - Attachment 1. Electricity equipment inspection report.pdf (264 KB)
Appendix 2 - Attachment 2. Act on operation of electricity market.pdf (181 KB)
Appendix 3 - Attachment 3. Measures Act.pdf (186 KB)
Signed form Signed form (683 KB)
DOE clarification
VVS version VVS 9.0
Current status 25 Nov 16 - Approved
Effective approval date: 25 Nov 16
Historic statuses 27 Oct 16 - Request published