15:41 10 Nov 25
Project:
2225 Korea Midland Power Co., LTD. (KOMIPO) Boryeong Small Hydroelectric Power Plant Project
- Request for post-registration changes
| Project | 2225 Korea Midland Power Co., LTD. (KOMIPO) Boryeong Small Hydroelectric Power Plant Project |
|---|---|
| PRC ref | PRC-2225-001 |
| Process track | Issuance |
| DOE | DTSUS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Aug 09 - 31 Jul 19 |
| Assessment opinion |
Assessment opinion (346 KB)
|
| Revised PDD |
Revised PDD (1169 KB)
Revised PDD - track changes (1199 KB)
|
| Supplementary documents |
Appendix 1 - Attachment 1. Electricity equipment inspection report.pdf (264 KB)
Appendix 2 - Attachment 2. Act on operation of electricity market.pdf (181 KB)
Appendix 3 - Attachment 3. Measures Act.pdf (186 KB)
|
| Signed form |
Signed form (683 KB)
|
| DOE clarification | |
| VVS version | VVS 9.0 |
| Current status | 25 Nov 16 -
Approved
Effective approval date: 25 Nov 16
|
| Historic statuses |
27 Oct 16 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: