Project: 1304 Henan Zhengzhou Grid Connected Natural Gas Combined Cycle Power Plant - Request for post-registration changes
Project 1304 Henan Zhengzhou Grid Connected Natural Gas Combined Cycle Power Plant
PRC ref PRC-1304-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 22 Feb 08 - 21 Feb 15
Assessment opinion Assessment opinion (163 KB)
Revised PDD Revised PDD (710 KB)   Revised PDD - track changes (756 KB)
Supplementary documents
Signed form Signed form (1010 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Apr 13 - Approved
Effective approval date: 12 Apr 13
Historic statuses 14 Mar 13 - Request published