Project: 1103 Manasi River Stage I Hydropower Project of Hongshanzui Hydropower Plant, Xinjiang Tianfu Thermoelectric Co., Ltd. - Request for post-registration changes
Project 1103 Manasi River Stage I Hydropower Project of Hongshanzui Hydropower Plant, Xinjiang Tianfu Thermoelectric Co., Ltd.
PRC ref PRC-1103-003
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 14 Sep 07 - 13 Sep 14
Assessment opinion Assessment opinion (112 KB)
Revised PDD Revised PDD (567 KB)   Revised PDD - track changes (518 KB)
Supplementary documents Appendix 1 - Manasi_PDD_with new template.pdf (636 KB)
Signed form Signed form (74 KB)
DOE clarification
VVS version VVS 2.0
Current status 17 Sep 14 - Approved
Effective approval date: 09 Sep 14
Historic statuses 05 Aug 14 - Published
05 Aug 14 - Summary note being prepared
19 Aug 14 - Awaiting EB decision