01:55 12 Nov 25
Project:
3841 Municipal Solid Waste (MSW) Composting Project in Ikorodu, Lagos State
- Request for post-registration changes
| Project | 3841 Municipal Solid Waste (MSW) Composting Project in Ikorodu, Lagos State |
|---|---|
| PRC ref | PRC-3841-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 15 Dec 10 - 14 Dec 17 |
| Assessment opinion |
Assessment opinion (656 KB)
|
| Revised PDD |
Revised PDD (1558 KB)
Revised PDD - track changes (1731 KB)
|
| Supplementary documents |
Appendix 1 - 1st MP_ER Calculation_Ikorodu_v3_141018.xlsb (5619 KB)
Appendix 2 - 1st MP_ER Calculation_Ikorodu_v3_Non-conservative.xlsb (5524 KB) |
| Signed form |
Signed form (103 KB)
|
| DOE clarification | |
| VVS version | VVS 7.0 |
| Current status | 06 May 15 -
Rejected
Effective rejection date: 04 May 15.
Reason (76 KB)
|
| Historic statuses |
13 Jan 15 -
Published 02 Feb 15 - Awaiting DOE clarifications 06 Feb 15 - DOE clarifications received 31 Mar 15 - Summary note being prepared 13 Apr 15 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: