00:27 18 May 25
Project:
3841 Municipal Solid Waste (MSW) Composting Project in Ikorodu, Lagos State
- Request for post-registration changes
Project | 3841 Municipal Solid Waste (MSW) Composting Project in Ikorodu, Lagos State |
---|---|
PRC ref | PRC-3841-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 15 Dec 10 - 14 Dec 17 |
Assessment opinion |
![]() |
Revised PDD |
![]() ![]() |
Supplementary documents |
Appendix 1 - 1st MP_ER Calculation_Ikorodu_v3_141018.xlsb (5619 KB)
Appendix 2 - 1st MP_ER Calculation_Ikorodu_v3_Non-conservative.xlsb (5524 KB) |
Signed form |
![]() |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 06 May 15 -
Rejected
Effective rejection date: 04 May 15.
![]() |
Historic statuses |
13 Jan 15 -
Published 02 Feb 15 - Awaiting DOE clarifications 06 Feb 15 - DOE clarifications received 31 Mar 15 - Summary note being prepared 13 Apr 15 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: