Project: 0987 Energy Efficiency through Alteration of fuel oil atomizing media in coal-fired thermal power plant - Request for post-registration changes
Project 0987 Energy Efficiency through Alteration of fuel oil atomizing media in coal-fired thermal power plant
PRC ref PRC-0987-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Aug 03 - 31 Jul 13
Assessment opinion Assessment opinion (84 KB)
Revised PDD Revised PDD (676 KB)   Revised PDD - track changes (811 KB)
Supplementary documents Appendix 1 - Annex I.pdf (382 KB)
Appendix 2 - Annex II.pdf (252 KB)
Appendix 3 - Annex III.pdf (66 KB)
Signed form Signed form (173 KB)
DOE clarification
VVS version VVS 2.0
Current status 01 Jul 13 - Approved
Effective approval date: 30 May 13
Historic statuses 19 Mar 13 - Published
19 Mar 13 - Summary note being prepared
09 May 13 - Awaiting EB decision