Project: 2148 Chumporn applied biogas technology for advanced waste water management - Request for post-registration changes
Project 2148 Chumporn applied biogas technology for advanced waste water management
PRC ref PRC-2148-001
Process track Prior approval
DOE GLC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 09 Feb 2009 - 31 Aug 2010

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 09 Feb 09 - 08 Feb 19
Assessment opinion Assessment opinion (229 KB)
Revised PDD Revised PDD (1565 KB)   Revised PDD - track changes (1720 KB)
Supplementary documents Appendix 1 - CPI_Revised ER calculation sheet for ex-ante estimation_2014-08-09.xls (241 KB)
Appendix 2 - CPI_Revised IRR calculation_2014-11-20.xls (347 KB)
Signed form Signed form (449 KB)
DOE clarification DOE clarification 1 - Response to Clarification_2014-11-24.pdf (45 KB)
VVS version VVS 2.0
Current status 29 Dec 14 - Approved
Effective approval date: 28 Dec 14
Historic statuses 28 Oct 14 - Published
12 Nov 14 - Awaiting DOE clarifications
24 Nov 14 - DOE clarifications received
24 Nov 14 - Summary note being prepared
08 Dec 14 - Awaiting EB decision