Project: 0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia. - Request for post-registration changes
Project 0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia.
PRC ref PRC-0867-002
Process track Prior approval
DOE SIRIM
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2011 - 30 Oct 2012
Assessment opinion Assessment opinion (160 KB)
Revised PDD  
Supplementary documents Appendix 1 - COD deviation 95 confidence level_0805.xls (55 KB)
Signed form Signed form (717 KB)
DOE clarification
VVS version VVS 2.0
Current status 18 Sep 13 - Approved
Effective approval date: 17 Sep 13
Historic statuses 13 Aug 13 - Published
13 Aug 13 - Summary note being prepared
27 Aug 13 - Awaiting EB decision