Project: 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa - Request for post-registration changes
Project 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa
PRC ref PRC-9007-004
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project or programme design
  • Changes have an impact on: Changes to the programme boundary to expand geographical coverage, Include additional host Parties, Geographical boundary of the PoA is expanded within the host Party or to include one or more host Parties
Applicable crediting period 25 Apr 13 - 24 Apr 20
Assessment opinion Assessment opinion (735 KB)
Revised PDD Revised PDD (16 MB)   Revised PDD - track changes (16 MB)
Supplementary documents Appendix 1 - Zimbabwe_fNRB_FAO_2015.xlsx (528 KB)
Appendix 2 - 06_Zimbabwe_Bold_Calculation.xlsx (289 KB)
Appendix 3 - 03_Zimbabwe_LoA.pdf (293 KB)
Signed form Signed form (2815 KB)
DOE clarification DOE clarification 1 - 681_PoA_Val Rep_PRC_clean.pdf (729 KB)
DOE clarification 2 - 681_PoA_Val Rep_PRC_TC.pdf (731 KB)
DOE clarification 3 - Zimbabwe_Bold_Calculation.xlsx (289 KB)
VVS version VVS-PoA 2.0
Current status 02 Oct 19 - Approved
Effective approval date: 01 Oct 19
Historic statuses 13 Aug 19 - Published
27 Aug 19 - Awaiting DOE clarifications
04 Sep 19 - DOE clarifications received
04 Sep 19 - Summary note being prepared
11 Sep 19 - Awaiting EB decision