15:21 23 Nov 24
Project:
9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa
- Request for post-registration changes
Project | 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa |
---|---|
PRC ref | PRC-9007-004 |
Process track | Prior approval |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 25 Apr 13 - 24 Apr 20 |
Assessment opinion | Assessment opinion (735 KB) |
Revised PDD | Revised PDD (16 MB) Revised PDD - track changes (16 MB) |
Supplementary documents |
Appendix 1 - Zimbabwe_fNRB_FAO_2015.xlsx (528 KB)
Appendix 2 - 06_Zimbabwe_Bold_Calculation.xlsx (289 KB) Appendix 3 - 03_Zimbabwe_LoA.pdf (293 KB) |
Signed form | Signed form (2815 KB) |
DOE clarification |
DOE clarification 1 - 681_PoA_Val Rep_PRC_clean.pdf (729 KB)
DOE clarification 2 - 681_PoA_Val Rep_PRC_TC.pdf (731 KB) DOE clarification 3 - Zimbabwe_Bold_Calculation.xlsx (289 KB) |
VVS version | VVS-PoA 2.0 |
Current status | 02 Oct 19 -
Approved
Effective approval date: 01 Oct 19
|
Historic statuses |
13 Aug 19 -
Published 27 Aug 19 - Awaiting DOE clarifications 04 Sep 19 - DOE clarifications received 04 Sep 19 - Summary note being prepared 11 Sep 19 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: