06:18 24 Nov 25
Project:
9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa
- Request for post-registration changes
| Project | 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa |
|---|---|
| PRC ref | PRC-9007-004 |
| Process track | Prior approval |
| DOE | Carbon Check |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 25 Apr 13 - 24 Apr 20 |
| Assessment opinion |
Assessment opinion (735 KB)
|
| Revised PDD |
Revised PDD (16 MB)
Revised PDD - track changes (16 MB)
|
| Supplementary documents |
Appendix 1 - Zimbabwe_fNRB_FAO_2015.xlsx (528 KB)
Appendix 2 - 06_Zimbabwe_Bold_Calculation.xlsx (289 KB)
Appendix 3 - 03_Zimbabwe_LoA.pdf (293 KB)
|
| Signed form |
Signed form (2815 KB)
|
| DOE clarification |
DOE clarification 1 - 681_PoA_Val Rep_PRC_clean.pdf (729 KB)
DOE clarification 2 - 681_PoA_Val Rep_PRC_TC.pdf (731 KB)
DOE clarification 3 - Zimbabwe_Bold_Calculation.xlsx (289 KB)
|
| VVS version | VVS-PoA 2.0 |
| Current status | 02 Oct 19 -
Approved
Effective approval date: 01 Oct 19
|
| Historic statuses |
13 Aug 19 -
Published 27 Aug 19 - Awaiting DOE clarifications 04 Sep 19 - DOE clarifications received 04 Sep 19 - Summary note being prepared 11 Sep 19 - Awaiting EB decision |

Assessment opinion
Appendix 1 - Zimbabwe_fNRB_FAO_2015.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: