Project: 3809 Jeju special self-governing province Wind Power Project - Request for post-registration changes
Project 3809 Jeju special self-governing province Wind Power Project
PRC ref PRC-3809-001
Process track Prior approval
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Change to the start date of the crediting period
  • Proposed start date of crediting period: 12 Apr 2012
Assessment opinion Assessment opinion (143 KB)
Revised PDD  
Supplementary documents Appendix 1 - Appendix 1. The electricity business approval letter.pdf (203 KB)
Appendix 2 - Appendix 2. The utilization contract of electricity supply system.pdf (609 KB)
Appendix 3 - Appendix 3. The utilization contract of electricity distribution system.pdf (793 KB)
Appendix 4 - Appendix 4. The guideline for distribution system connection technique of distributed resources.pdf (191 KB)
Appendix 5 - Appendix 5. The official document for operation starting of Pyosun substation.pdf (372 KB)
Appendix 6 - Appendix 6. The electricity generation test operation report(plant #1~#13).pdf (3304 KB)
Signed form Signed form (634 KB)
DOE clarification DOE clarification 1 - 3809_Assessment Opinion_PRC_Clarification Request_ver.02.pdf (206 KB)
DOE clarification 2 - 3809_Assessment Opinion_PRC_Clarification Request_ver.02_track.pdf (211 KB)
DOE clarification 3 - 3809_DOE response for Clarification Request.pdf (780 KB)
DOE clarification 4 - Appendix 7. (Additional) electricity generation test report.pdf (1543 KB)
DOE clarification 5 - Appendix 8_Construction completion documents_public.pdf (883 KB)
DOE clarification 6 - Appendix 9. EF calculation sheet_2009-2011.xls (629 KB)
VVS version VVS 2.0
Current status 13 Jan 13 - Approved
Effective approval date: 11 Jan 13
Historic statuses 06 Dec 12 - Published
07 Dec 12 - Awaiting DOE clarifications
21 Dec 12 - DOE clarifications received
21 Dec 12 - Summary note being prepared
21 Dec 12 - Awaiting EB decision