17:33 22 Jan 26
Project:
0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project
- Request for post-registration changes
| Project | 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project |
|---|---|
| PRC ref | PRC-0530-002 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 01 Sep 09 - 31 Aug 16 |
| Assessment opinion |
Assessment opinion (198 KB)
|
| Revised PDD |
Revised PDD (1000 KB)
Revised PDD - track changes (1947 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (119 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 23 May 23 -
Approved
Effective approval date: 23 May 23
|
| Historic statuses |
24 Apr 23 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: