11:43 04 Nov 25
			
			
      Project:
      0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project
      - Request for post-registration changes
    
					| Project | 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project | 
|---|---|
| PRC ref | PRC-0530-002 | 
| Process track | Issuance | 
| DOE | KBS | 
| 
          Methodology(ies) and/or Standardized Baseline(s) 
           applied at the post-registration changes  | 
        No changes | 
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | 
          
            Corrections that do not affect project design
            
 Changes to the project or programme design 
  | 
      
| Applicable crediting period | 01 Sep 09 - 31 Aug 16 | 
| Assessment opinion | 
           Assessment opinion (198 KB)
         | 
      
| Revised PDD | 
           Revised PDD (1000 KB)
           
           Revised PDD - track changes (1947 KB)
         | 
      
| Supplementary documents | |
| Signed form | 
           Signed form (119 KB)
         | 
      
| DOE clarification | |
| VVS version | VVS-PA 3.0 | 
| Current status | 23 May 23 -
                      Approved
             
              Effective approval date: 23 May 23
             
            
           | 
        
| Historic statuses | 
            
              
                
                24 Apr 23 -
                Request published | 
        

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: