Project: 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project - Request for post-registration changes
Project 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project
PRC ref PRC-0530-002
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Sep 09 - 31 Aug 16
Assessment opinion Assessment opinion (198 KB)
Revised PDD Revised PDD (1000 KB)   Revised PDD - track changes (1947 KB)
Supplementary documents
Signed form Signed form (119 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 23 May 23 - Approved
Effective approval date: 23 May 23
Historic statuses 24 Apr 23 - Request published