Project: 0347 Chambal Power Limited’s (CPL) proposed 7.5 MW biomass based power project at Rangpur, Kota District, Rajasthan, India - Request for post-registration changes
Project 0347 Chambal Power Limited’s (CPL) proposed 7.5 MW biomass based power project at Rangpur, Kota District, Rajasthan, India
PRC ref PRC-0347-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Mar 13 - 29 Feb 20
Assessment opinion Assessment opinion (290 KB)
Revised PDD Revised PDD (1164 KB)   Revised PDD - track changes (1162 KB)
Supplementary documents
Signed form Signed form (237 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 21 Apr 21 - Approved
Effective approval date: 21 Apr 21
Historic statuses 23 Mar 21 - Request published