Project: 5123 Wind Power Project in Tirunelveli (Tamilnadu), India by M/s Nagarjuna Fertilizers and Chemicals Limited - Request for post-registration changes
Project 5123 Wind Power Project in Tirunelveli (Tamilnadu), India by M/s Nagarjuna Fertilizers and Chemicals Limited
PRC ref PRC-5123-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 22 Aug 11 - 21 Aug 21
Assessment opinion Assessment opinion (977 KB)
Revised PDD Revised PDD (238 KB)   Revised PDD - track changes (241 KB)
Supplementary documents Appendix 1 - 5123_NFCL_Registered PDD.pdf (238 KB)
Appendix 2 - Upload Information for Documents.pdf (95 KB)
Signed form Signed form (55 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Feb 14 - Approved
Effective approval date: 07 Feb 14
Historic statuses 09 Jan 14 - Request published