10:44 12 Dec 24
Project:
1318 Fujian Zhangpu Liuao 45MW Wind Power Project
- Request for post-registration changes
Project | 1318 Fujian Zhangpu Liuao 45MW Wind Power Project |
---|---|
PRC ref | PRC-1318-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 21 Jan 08 - 20 Jan 15 |
Assessment opinion | Assessment opinion (367 KB) |
Revised PDD | Revised PDD (544 KB) Revised PDD - track changes (545 KB) |
Supplementary documents | |
Signed form | Signed form (1511 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 07 Jan 13 -
Approved
Effective approval date: 07 Jan 13
|
Historic statuses |
07 Dec 12 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: