Project: 1318 Fujian Zhangpu Liuao 45MW Wind Power Project - Request for post-registration changes
Project 1318 Fujian Zhangpu Liuao 45MW Wind Power Project
PRC ref PRC-1318-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 21 Jan 08 - 20 Jan 15
Assessment opinion Assessment opinion (367 KB)
Revised PDD Revised PDD (544 KB)   Revised PDD - track changes (545 KB)
Supplementary documents
Signed form Signed form (1511 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Jan 13 - Approved
Effective approval date: 07 Jan 13
Historic statuses 07 Dec 12 - Request published