16:46 02 Nov 25
Project:
1318 Fujian Zhangpu Liuao 45MW Wind Power Project
- Request for post-registration changes
| Project | 1318 Fujian Zhangpu Liuao 45MW Wind Power Project |
|---|---|
| PRC ref | PRC-1318-001 |
| Process track | Issuance |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 21 Jan 08 - 20 Jan 15 |
| Assessment opinion |
Assessment opinion (367 KB)
|
| Revised PDD |
Revised PDD (544 KB)
Revised PDD - track changes (545 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (1511 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 07 Jan 13 -
Approved
Effective approval date: 07 Jan 13
|
| Historic statuses |
07 Dec 12 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: