Project: 3745 Su Pan 2 Hydro Power Project - Request for post-registration changes
Project 3745 Su Pan 2 Hydro Power Project
PRC ref PRC-3745-002
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 30 Dec 11 - 29 Dec 18
Assessment opinion Assessment opinion (121 KB)
Revised PDD Revised PDD (1484 KB)   Revised PDD - track changes (1526 KB)
Supplementary documents Appendix 1 - Annex 1. Business Registration No. 011022001182 by Hanoi Department of Planning and Investment .pdf (652 KB)
Appendix 2 - Annex 2. Email from PP to UNFCCC secretariat.pdf (34 KB)
Appendix 3 - Annex 3. Email from Vietnam DNA to UNFCCC secretariat.pdf (197 KB)
Appendix 4 - Annex 4. Specifications of the units in the FSR.pdf (217 KB)
Appendix 5 - Annex 5 . Equipment purchase contract.pdf (223 KB)
Appendix 6 - Annex 6. Nameplate of the units.pdf (2128 KB)
Appendix 7 - Annex 7. Annex of power purchase agreement.pdf (1301 KB)
Appendix 8 - Annex 8. Decision No. 652002QD-BKHCNMT of national regulation in Viet Nam.pdf (384 KB)
Appendix 9 - Annex 9. Investment Revision in the FSR.pdf (136 KB)
Appendix 10 - Annex 10. Equipment Design of Technical Design by Song Da Consultant Company .pdf (267 KB)
Appendix 11 - Annex 11. Investment Cost Revision of the project issued by Song Da Consulting Joint Stock Company.pdf (206 KB)
Signed form Signed form (481 KB)
DOE clarification
VVS version VVS 2.0
Current status 30 Dec 13 - Approved
Effective approval date: 30 Dec 13
Historic statuses 28 Nov 13 - Request published