20:19 11 Nov 25
Project:
10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda
- Request for post-registration changes
| Project | 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda |
|---|---|
| PRC ref | PRC-10186-003 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD |
| Applicable crediting period | 28 Aug 15 - 27 Aug 22 |
| Assessment opinion |
Assessment opinion (921 KB)
|
| Revised PDD |
Revised PDD (2650 KB)
Revised PDD - track changes (836 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (695 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 15 Mar 19 -
Approved
Effective approval date: 13 Mar 19
|
| Historic statuses |
18 Feb 19 -
Published 18 Feb 19 - Summary note being prepared 21 Feb 19 - Awaiting EB decision |

Assessment opinion
Revised PDD
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: