Project: 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda - Request for post-registration changes
Project 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda
PRC ref PRC-10186-003
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD
Applicable crediting period 28 Aug 15 - 27 Aug 22
Assessment opinion Assessment opinion (921 KB)
Revised PDD Revised PDD (2650 KB)   Revised PDD - track changes (836 KB)
Supplementary documents
Signed form Signed form (695 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 15 Mar 19 - Approved
Effective approval date: 13 Mar 19
Historic statuses 18 Feb 19 - Published
18 Feb 19 - Summary note being prepared
21 Feb 19 - Awaiting EB decision