Project: 10053 Empowering DRC communities through the use of Improved Cook Stoves - Request for post-registration changes
Project 10053 Empowering DRC communities through the use of Improved Cook Stoves
PRC ref PRC-10053-002
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project or programme design
  • Changes have an impact on: Include additional host Parties
Applicable crediting period 17 Oct 14 - 16 Oct 21
Assessment opinion Assessment opinion (881 KB)
Revised PDD Revised PDD (4088 KB)   Revised PDD - track changes (4375 KB)
Supplementary documents Appendix 1 - PoA10053_Summary sheet fNRB.xlsx (18 KB)
Appendix 2 - Letter_of_Approval_POA10053_Zambia-1.pdf (586 KB)
Appendix 3 - LoA and EIA Letter_Mozambique.pdf (2282 KB)
Appendix 4 - BURN LoA_final_Nigeria.pdf (1114 KB)
Appendix 5 - 12.01.2021 LoA Kenya_final_Kenya.pdf (822 KB)
Signed form Signed form (2702 KB)
DOE clarification DOE clarification 1 - 20210513_PoA10053 in DRC_PoA-DD_V09.2_clean.pdf (4088 KB)
DOE clarification 2 - 20210513_PoA10053 in DRC_PoA-DD_V09.2_track.pdf (4375 KB)
DOE clarification 3 - CCIPL 867- PoA PRC CL FVR-15052021 - clean.pdf (840 KB)
DOE clarification 4 - CCIPL 867- PoA PRC CL FVR-15052021- TC.pdf (847 KB)
DOE clarification 5 - CCIPL 867- PoA PRC CL FVR-29052021 - clean.pdf (881 KB)
DOE clarification 6 - CCIPL 867- PoA PRC CL FVR-29052021 - tc.pdf (884 KB)
DOE clarification 7 - EIA exemption Letter_Mozambique.pdf (984 KB)
DOE clarification 8 - EIA_Exemption_Zambia.pdf (223 KB)
VVS version VVS-PoA 2.0
Current status 29 Jun 21 - Approved
Effective approval date: 28 Jun 21
Historic statuses 26 Apr 21 - Published
26 May 21 - Awaiting DOE clarifications
01 Jun 21 - DOE clarifications received
01 Jun 21 - Summary note being prepared
08 Jun 21 - Awaiting EB decision