Project: 1341 7.2 MW Wind Project at Chitradurga, Karnataka - Request for post-registration changes
Project 1341 7.2 MW Wind Project at Chitradurga, Karnataka
PRC ref PRC-1341-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Feb 08 - 31 Jan 18
Assessment opinion Assessment opinion (514 KB)
Revised PDD Revised PDD (1102 KB)   Revised PDD - track changes (1103 KB)
Supplementary documents
Signed form Signed form (97 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Apr 13 - Approved
Effective approval date: 12 Apr 13
Historic statuses 14 Mar 13 - Request published